Our Projects

Keppel Fels Limited

PROJECTS ACTIVITIES
B329 Fabrication , installation & testing of the piping system ,Vent & sound system; Fire water system ( Hull ); Mud conditioning / mud process system; Fresh & potable water system (Hull); Hydraulic cantilever & drill floor skidding; Hydraulic system for leg fixation; Chilled water system (outside LQ); LQ Piping System.
B333 (1) Electrical works for group 45 (machinery deck & LQ) of entire vessel including electrical equipment, instrument, apparatuses and accessories; Cabling (power system); Cabling (non-power system); Master cableway; Ground mounted panel.
B333 (2) Raw/ Salt Water Syatem/ Preload System Rig Floor Hydraulic System Compressed Air System Brine System Preload Tank Dumping System Well Test Piping BOP & Diverter Control Hydraulic System Diverter System Exhaust & Crankcase System.
B334 Raw/ Salt Water Syatem/ Preload System Rig Floor Hydraulic System Compressed Air System Brine System Preload Tank Dumping System Well Test Piping BOP & Diverter Control Hydraulic System. Diverter System Exhaust & Crankcase System.
R338 Fabrication, installation & testing for HP & HT washing water distribution drilling, sea water service system, remote tank sounding (gauging & drafting) system, blinge system, main engine sea water cooling system.
B317 Ballast system, sea water cooling, air bend and sounding system, fire fighting system.
B359: 1 UNIT KFELS “B” CLASS Raw salt water system/ preload system, compressed air system (hull), brine system, preload tank dumping system, well testing system & deluge system, sanitary water supply system (hull), bop & diverter control hydraulic system and diverter system, exhaust and crankcase system.
B353: KFELS “B” CLASS MOBILE Raw salt water system/ preload system, compressed air system, brine system, preload tank dumping system, well test system, sanitary water supply system, bop & diverter control hydraulic system, diverter system, exhaust & crankcase system.
B359: 1 UNIT KFELS “B” CLASS Chalk test of water tight doors without door closer, opening and closing of manholes, install hinged and bolted hatch cover including chalk/ hose test, mechanical equipment installation.
B347: 1 UNIT CJ-70 Install mechanical equipments: passenger lift, cargo lifts (main hull) 1 helideck transport platform lift.

Keppel Singmarine Pte Ltd

PROJECTS ACTIVITIES
M1365 Install, Steel Outfitting Works, Weld and Grind, Structural Duct at Onboard Vessel.
M1349 Fab/Install & Weld Ventilation Pipe Ducting System.
E1368 Fab pipe spools with installation & testing until commissioning for the following piping systems: Fire Water; Foam; Vent & Sound.
E1367 Fab pipe spools with installation & testing until commissioning for the following piping systems: Fire Water; Foam; Vent & Sound.
R347 West Atlas - Provide consumables, skilled labour, competent supervision and handtools to carry out removal works at the following area:
1. STBD FWD AMR; 2. STBD AFT AMR; 3. MAIN STORAGE ROOM;
4. HEAVY TOOLS ROOM; 5. MUD PIT ROOM; 6. MUD PUMP ROOM;
7. ELECTRICAL WORKSHOP; 8. MECHANICAL WORKSHOP; 9. ENGINE ROOM; 10. HELIDECK.
M1363 Pipe fabrication, welding, grinding, pressure testing, fire alarm and deck wash system.
E1381 (186M PIPELAY VESSEL) Installation, on-site weighing of field weld spools, doublers, penetration, supports and hydrotest.
H292 Vent & sounding pipe spools welding, w.8 piping sys pipe spools welding.
H327 Overflow alarm pipes, fab, install & pressure test domestic fresh water piping sys.
H328 Fab, install & pressure test oil recovery piping sys.
H326 Fab, install & pressure test co2 sys, steam & condensate, boiler feed, foam sys, fire water piping sys.
H337 Epp sys, aht winch & server, shark jaw, steering gear, bow-thruster, anchor windlass, capstan syd sys.

Keppel Shipyard (Castorone)

PROJECTS ACTIVITIES
B20900 Electrical Works. Weld & install sub cable ladder, lights installation including brackets, carry out cables laying & termination works, and installation of distribution boards & junction boxes.

Keppel Shipyard

PROJECTS ACTIVITIES
B030 Repair and Maintenance of Yard's Compressed Air Line Pipes.

Keppel Shipyard Limited

PROJECTS ACTIVITIES
B20633 Ballast water & maunal sounding system modify, fab, cable laying, termination & install cable tray.
B20633 DLB NORCE ENDEAVOUR Electrical, ballast water & manual sounding system modify, fab, cable laying, termination & install cable tray. Piping, fresh water cooling system. .

Kimheng Shipbuilding & Engineering Pte Ltd

PROJECTS ACTIVITIES
KHSE-H1010 Piping, fabricate, install and testing the fire main deck wash system; chiller water system; bilge system; ballast system.
JS34-580 Fabricate, install, welding and testing of service air, starting air piping system, rectify china pipeline, welding,grinding and bracket change the gasket,bolt & nut tighten. U-bolt install, pressure testing.
KHSE-H1010 Piping, fabricate, install & testing the fire main deck wash system; chiller water system; bilge system; ballast system.

Drydocks World Singapore

PROJECTS ACTIVITIES
N60190 Steering gera rudder hydraulic line fabrication and installation with valve and testing. Hydraulic tubing for stern tube port & stbd. Hydraulic tubing for AZIMUTH thrusters FWD and AFT. Hydraulic tubing for bow thrusters and stern thrusters. Tanks air bell and penetration installation. N2 system pipe fabrication and installation with valves, remote sounding system copper tube tray and copper tube installation with testing. Seal pipe line (port & stbd) fabrication, installation and pressure testing with valves. Carry out deck drain system for complete block. Carry out fire hydrant line system for complete block.
HULL 190-UT 788 CD Fabricate, install, welding and testing of service air, starting air piping system, rectify china pipeline, welding,grinding and bracket change the gasket,bolt & nut tighten. U-bolt install, pressure testing.
KHSE-H1010 Hydraulic tubing for stern tube port & stbd, 48 tanks air bell and penetration installing, hydraulic tubing for bow thruster and stern thruster, hydraulic tubing for azimuth thruster swd and aft.

Jurong Shipyard

PROJECTS ACTIVITIES
Sea Dragon Electrical installation and termination, fitting and welding.
West Elara Electrical installation and termination, fitting and welding.

Dyna-mac Engineering Services Pte Ltd

PROJECTS ACTIVITIES
WO/JNS663/9220 Fabrication & installation of all e & i supports, galvanized & ss316 cable tray & ladder installation, earth cable system, low voltage cable, electrical fixtures, instrument air, mct installation, panel, jd, db, rack installation, heat tracing.

Sembawang Shipyard Pte Ltd

PROJECTS ACTIVITIES
C-72436 FLINTSTONE PROJECT Cold & hot water systems, control air system, novec 1230 fire fighting system, pneumatic quick closing valves, wet chemical fire fighting system, work air system, lubrication system for thruster 1, 2, 3 & 4.
Flinstone Project-Tubing Fabrication & Installation Work. Fabrication & installation of pipe work including in-line valves, fitting, pipe supports/brackets, normal flushing & pressure test (hydro test), & reinstatement of piping systems.

Keppel Singmarine Pte Ltd

PROJECTS ACTIVITIES
H292 Vent & sounding pipe spools welding, W.8 piping system pipe spools welding.
H317 Pneumatic quick closing valve system, remote operated valve control system, oxygen & acetylene cylinder piping system. CPP system, AHT winch & server, shark jaw, steering gear, bow- thrusters, anchor windlass, capstan hyd piping system.
H326 Fabrication, installation & pressure test CO2 system, steam & condensate, boiler feed, foam system, fire water piping system.
H327 Overflow alarm pipes, fabrication, installation & pressure test domestic fresh water piping system.
H328 Fabrication, installation & pressure test oil recovery piping system.
H337 EPP system, AHT winch & server, shark jaw, steering gear, bow- thrusters, anchor windlass, captan SYD system. Pneumatic quick closing valve system, remote operated valve control system, oxygen & acetylene cylinder piping system.
H338 Deck machinery, bow thrusters hyd, shark jaw & towing pin, deck crane hyd piping sys.
H339 Deck machinery, bow thrusters hyd, shark jaw & towing pin, deck crane hyd.
H340 Install air con penetration. CO2 & chemical dosing piping system.
H341 Low pressure water mist, N2 piping system.
H343 Install outfitting item onboard vessel.
H356 Bilge, ballast, fire main & deck wash, S.W cooling, S.W. SVC, F.W cooling, F.W. SVC, fuel oil SVC, fuel oil transfer, lube oil, dirty oil, vent & sounding, compressed air, plumbing drain, hyd, offship fire fighting, engine exhaust, chemical dosing, deck drain & scupper piping system.
H357 Bilge, ballast, fire main & deck wash, S.W cooling, S.W. SVC, F.W cooling, F.W. SVC, fuel oil SVC, fuel oil transfer, lube oil, dirty oil, vent & sounding, compressed air, plumbing drain, hyd, offship fire fighting, engine exhaust, chemical dosing, deck drain & scupper piping system.
M1380(CATAMARAN AIR DIVE SUPPORT VSL) Fire monitor p/form modify bulwark, bow thruster rm s.w cooling pump seating, modify grease trap seating, eng rm tween dk handrail modify accom. Door opening relocate & add stiffener, aft thruster motor seating, dk w/shop drill machine & grinding machine seating, eng rm novec cabinet relocate, relocate antenna seating, 100t turning blk, relocate & extend mast, add water fountain seating in lobby, relocate a-frame hpu starter panel.
E1379 (KEPPEL FELS PROJ B340) Drill water system, Fire water piping system.
E1378 (TRANSHIPMENT BARGE) Install & pressure testing in bilge & oily water system.
P1375 (BULK CARRIER) Fab, assemble and erection of the block, install window for h375, install & joint v.l.
P1374 (BULK CARRIER) Fab & install add. Stiffener reinforcement on port side longi. Bhd of s/gear rm fr0-fr3.
M1372 (91M CONTAINER VESSEL) Fab spools in pipeshop.
E1371 (KEPPEL FELS PROJ B338) Fab/ install testing in w/shop & onboard h371 for vent & sound sys (vs) for skimmer tk for dwg p206-iso-vs, install vh tubing on b339 port strip.
E1370 (KEPPEL FELS PROJECT B337) Intsall/ hydro-test vent & sounding sys.
M1369 (65T BOLLARD PULL ASD TUG) Fab spools in pipeshop, pipe fab/ grinding in w/shop.
M1366 (DIVING SUPPORT CONSTRUCTION VS) Relocate & modify aft overhead console seating, fab & installation of lose tk, weld container shoes at f’cle dk & boat dk (grinding job incl), modify shelter dk handrail, fab & install 250t crane boom rest bumper & wire guide, fab & install anchor windlass operating p/form, modify male change rm locker seating, cut opening & install kick off panel 3nos fab & install welding set sheating & boot locker seating, install container shoe & underdk carling iwo f’cle dk & boat dk.
H357 Bilge, ballast, fire main & deck wash, s.w. cooling, s.w. svc, f.w. cooling, f.w. svc, fuel oil svc, fuel oil transfer, lube oil, dirty oil, vent & sounding, compressed air, plumbing drain, hyd, offship fire fighting, egine exhaust, chemical dosing, deck drain & scupper piping sys.
H356 Bilge, ballast, fire main & deck wash, s.w. cooling, s.w. svc, f.w. cooling, f.w. svc, fuel oil svc, fuel oil transfer, lube oil, dirty oil, vent & sounding, compressed air, plumbing drain, hyd, offship fire fighting, egine exhaust, chemical dosing, deck drain & scupper piping sys.
H340 Co2 & chemical dosing piping sys.
H343 Install outfitting item on board the vessel.
H340 Install air con penetration.
H317 Cpp sys, aht winch & server, shark jaw, steering gear, bow- thruster, anchor windlass, capstan hyd piping sys.
H338 Deck machinery, b/thruster hy, shark jaw & towing pin, deck crane hyd piping sys.
H317 Pneumatic quick closing valve sys, remote operated valve control sys, oxygen & acetylene cylinder piping sys.
H337 Pneumetic quick closing valve sys, remote operated valve control sys, oxygen & acetylene cylinder piping sys.
H341 Low pressure water mist. , n2 piping system.
H339 Deck machinery, bow thruster hyd, shark jaw & towing pin, deck crane hyd.

Kwong Soon Engineering Pte Ltd

PROJECTS ACTIVITIES
Jascon 34 DP3 Laying Crane Barge Fabricate, installation, welding & testing of service air, starting air piping system.
JASCON 34 DP3 LAYING CRANE BARGE Fabricate, install, welding & testing of service air, starting air piping system.

Kimheng Shipbuilding & Engineering Pte Ltd

PROJECTS ACTIVITIES
KHSE-H1010 Piping, fabrication, installation and testing the fire main deck wash system, chiller water system, bilge system, ballast system.
JS34-580 service air, starting air piping system, rectify China pipeline, welding, grinding and bracket, change the gasket, bolt & nut tighten, U- bolt installation, pressure testing.
Jascon 25 DP3 Laying Crane Barge Piping, fabrication, installation & testing the fire main deck wash system, chiller water system, bilge system, ballast system & service air & starting piping system. Electrical installation, cable termination, fire & smoke detection system, fire alarm, TV system, accommodation & main deck lighting system, Navigation system cable installation & termination.
KHSE-H1010 Piping, fabrication, installation & testing the fire main deck wash system, chiller water system, bilge system, ballast system.

Keppel Shipyard Ltd

PROJECTS ACTIVITIES
B20633 Ballast water & manual sounding system modify, fabrication, cable laying, termination & installation of cable tray. Electrical, ballast water & manual sounding system modify fabrication, cable laying, termination & installation of cable tray. Piping, fresh water cooling system.
B20793(FPSO OSX I) Provide Rigger to assist in lifting electrical panel & cable drum and provide Signal Man to help moving materials.
B21037 M/deck cable box cover remove & refit for hot work.
B21255 MT SCORPIUS Replace glass & tube of fluorescent light in e/rm & funnel deck, igs instrument replacement, e house module fwd flat form modification, 200m cable ladder.
B21037 NORDIC VOYAGER M/Deck cable box cover remove & refit for hot work.
B20979 FSO MASONGGO Cable pulling, emergency stop push button install & termination, renew e/room fan room lighting, removal of lifeboat cable, panel & conduit pipe.

Drydocks World Singapore

PROJECTS ACTIVITIES
N60190 Hydraulic tubing for bow thrusters & stern thrusters.
N60189 Fabrication and installation deck scupper drain line, bulk handling system pressure testing.
S22414 Removed and renewed AFT peak tank suction pipe, installed and removed ballast tanks pipe blank.
S22411 Cargo tank heating coils pipe hydrotesting, pump room renew ballast drain pipe and blinge line, engine room renew sea water pipe line, cargo pressure testing, remove and refit suction pipe.
Hull 190-UT 788 CD Hydraulic tubing for stern tube port & stbd, 48 tanks air bell and penetration installation, hydraulic tubing for bow thrusters and stern thrusters, hydraulic tubing for azimuth thrusters FWD and AFT.
V22434 Portable Accomodation block for 184 passengers.Carry out deck drain system for complete block.Carry out fire hydrant line system for complete block.

Sembawang Shipyard Pte Ltd

PROJECTS ACTIVITIES
Flinstone Project Fabrication & installation of pipe work including in- line valves, fitting, pipe supports/ brackets, normal flushing & pressure test (hydro test) & reinstatement of piping systems.
C-72436 Flinstone Project Cold & hot water systems, control air system, NOVEC 1230 fire fighting system, pneumatic quick closing valves, wet chemical fire fighting system, work air system, lubrication system for thruster 1, 2, 3 & 4.

Jurong Shipyard

PROJECTS ACTIVITIES
Sea drill- 14 Electrical Installation and termination, fitting and Welding.
West Capricon Electrical Installation and termination, fitting and Welding.

Keppel Fels Limited

PROJECTS ACTIVITIES
M1113: “SHELL KULLUK” REPAIR Remove/ renew ehaust system, remove/ renew vent & sound system from 10m level to main deck.
B330: 1 UNIT KFELS SUPER “A” Water mist system (lq), chilled water system.
R381 “COSL SEEKER” REPAIR Electrical works.
M1128: REPR&MOD ROWAN GORILLA Cable ladders, electrical equipment & cables.
M1033: MOD- “CAN-DO BARGE” Electrical works & installation related to new crane.
M883: DSS-38E-DP3 SS LQ all cabling (power system), cabling (non-power system), cabling (fabric optic/ lan system), master cableway.
B339: 1 UNIT KFELS “B” CLASS Full jacking system, cabling (non-power system), cabling (fabric optic/ lan system), master cableway.
M877: FAB&INST NEW LQ Cabling (non-power system), cabling (fabric optic/ lan system), master cableway.
B345: 1 UNIT KFELS “B” CLASS Open/ close manhole and hatch, chalk & hose test for water tight door.
B332: 1 UNIT CJ-70 Install chequered plates, install mechanical equipments: passenger lift (lq), cargo lifts (main hull), helideck transport platform lift, tie down engine room, chequered plate, wire mesh, platform, ladders and handrails.